Manager- Electrical (Wind)

Date: 18 Nov 2024

Location: Kallam, India

Company: Sterlite Power Transmission Limited

Position Title

 

Manager - Electrical - Wind 

Position Summary

 

Responsible of Overall Electrical BOP activities of Wind project in timely manner with required standard of Safety and quality at site.

Position Demands

 

Travel As and when required

Key Accountabilities / Responsibilities

 

  • Responsible of electrical BOP work including PSS, Transmission line, 33 KV line, DP yard, GSS, WTG commissioning etc to Achieve contractual schedule
  • Maintain high and required standard of safety at site.
  • Ensure achievement of highest quality levels on site.
  • Maintain and manage various stakeholder to ensure timely delivery of project.
  • Team management and mentoring on site as applicable.
  • Site compliance audits and checks.
  • Responsible for overall management of electrical works in wind project site.
  • Daily / Weekly / Monthly project status reporting as applicable

About Us

 

Serentica Renewables is a renewable energy generator that enables energy-intensive industries transition to a clean energy future. We provide assured, firm renewable energy (RE) by developing, operating, and dispatching greenfield solar, wind, energy storage with balancing solutions.

Serentica plans to install ~1500 MW of solar & wind power across multiple sites in the states of the Karnataka, Rajasthan, and Maharashtra where the company has already acquired connectivity approvals. A large part of this capacity will be used to deliver close to 600MW of round-the-clock clean energy to various entities of the Vedanta Group. The company will focus on providing direct green energy solutions to commercial and industrial customers.

 

Aiding India’s Decarbonization agenda

Serentica is committed to reversing climate change by decarbonizing energy-intensive industries such as Steel, Cement, Aluminium and Zinc. Industries account for over 30% of total carbon emissions. In the medium-term, Serentica aims to install 5000MW of carbon-free generation capacity coupled with different storage technologies. Eventually, it aims to supply over 15 billion units of clean energy annually and displace 20 million tonnes of CO2 emissions.